This project was completed just before the first big freeze in early December. We built a large temporary structure to keep snow off and increase nighttime temperatures. This is a cinder block wall on a concrete footing. We clad the exterior with tiger stripe coursing sawn top and bottom. We hand chiseled the stone and installed with no mortar joints to make it look like a dry stack wall (matching dry stack walls around the property installed last year).
Saturday, January 29, 2011
Munro Residence
This project was completed just before the first big freeze in early December. We built a large temporary structure to keep snow off and increase nighttime temperatures. This is a cinder block wall on a concrete footing. We clad the exterior with tiger stripe coursing sawn top and bottom. We hand chiseled the stone and installed with no mortar joints to make it look like a dry stack wall (matching dry stack walls around the property installed last year).